Craft Wrap-Up
Oct. 16th, 2013 03:02 pmHow's that saying go? Two steps forward...yeah. Had some of that this week.
Quilting (Nada. Sorry, quilting!)
Quilting (Nada. Sorry, quilting!)
- Mystery Quilt: pieced the first of two borders! Easier than expected. I'll get the next one on soon enough.
- The Boy's Quilt: (ignored) I need to clean my floor, move furniture, and get this sandwiched.
- My Quilt: (ignored) With the need to think of my son's quilt's finishing, I think this one will sit a little longer.
- The jelly roll quilt: (ignored until the Mystery Quilt is done) Still waiting for something to be completed.
- The (new) socks: Sock2 Body is moving along, slowly, but moving along.
- MSFB Spats: tinking on the first one done, so now I can fix the edge. Finally.
- Birthday tank top: Still waiting for the armholes.
- LIME GREEN TANK: Nope.
- Orange top: I finished the knitting! WOO HOO! Kitchenered the shoulders, tried it on and...crap. Two inches too short. So it's in time out until I feel ready to do a little franken-surgery to add two inches to the bit between the bust and hem, because I can't just tack it on at the bottom. At least I have yarn for it. :-)
Cross Stitch (move along, move along...)
- Yellowstone Lodge: (ignored)
- Blue-green gradient: Based on the compression of the green portion, I've got more work ahead of me than I thought. Still chugging on it, though.
- 3#Fiber: (ignored) I'm going to start the test-spinning to reach a DK or Worsted eventually...I want a true 3-ply, I think. Must plan on how to arrange the singles while I spin it all up.
- "Fluff and Stuff" bag: ignored. But we're getting closer. I'm in a real "get the WIPs done" frame of mind.