imjustlori: (thin)
imjustlori ([personal profile] imjustlori) wrote2013-10-10 02:14 pm

Craft Wrap-Up

Things! I did things!

Quilting

  • Mystery Quilt: pieced the first of two borders! Easier than expected. I'll get the next one on soon enough.

  • The Boy's Quilt: (ignored)  I need to clean my floor, move furniture, and get this sandwiched.

  • My Quilt: (ignored) With the need to think of my son's quilt's finishing, I think this one will sit a little longer.

  • The jelly roll quilt: (ignored until the Mystery Quilt is done) Still waiting for something to be completed.

Knitting

  • The (new) socks: Sock2 Body is moving along, slowly, but moving along.

  • MSFB Spats: still making the first one right again, but this dark weather is making the tinking tough.

  • Birthday tank top: Still waiting for the armholes.

  • LIME GREEN TANK: Nope.

  • Orange top: Picked it up, finished the majority of the second panel of cool bits, and am starting the shoulders.

Cross Stitch (move along, move along...)

  • Yellowstone Lodge: (ignored)

Spinning

  • Blue-green gradient: Based on the compression of the green portion, I've got more work ahead of me than I thought. Still chugging on it, though.

  • 3#Fiber: (ignored) I'm going to start the test-spinning to reach a DK or Worsted eventually...I want a true 3-ply, I think. Must plan on how to arrange the singles while I spin it all up.

  • "Fluff and Stuff" bag: ignored. But we're getting closer. I'm in a real "get the WIPs done" frame of mind.


Post a comment in response:

This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting